As the 2025/2026 harvest season approaches its final stage, the TSG-250 boiler supplied by Triniton Engenharia Industrial to Grupo Pantaleon’s El Mante facility, located in the state of Tamaulipas, Mexico, continues to confirm in actual operation the high performance standards established during the project design phase. Tests conducted by Grupo Pantaleon itself have demonstrated outstanding results in energy efficiency and environmental control, with performance indicators significantly exceeding the parameters originally specified for the installation.


















